POJ 2031:Building a Space Station (Prim)
Time Limit: 1000MS
Memory Limit: 30000K
Total Submissions: 2516
Accepted: 1330
Description
You are a member of the space station engineering team, and are assigned a task in the construction process of the station. You are expected to write a computer program to complete the task.
The space station is made up with a number of units, called cells. All cells are sphere-shaped, but their sizes are not necessarily uniform. Each cell is fixed at its predetermined position shortly after the station is successfully put into its orbit. It is quite strange that two cells may be touching each other, or even may be overlapping. In an extreme case, a cell may be totally enclosing another one. I do not know how such arrangements are possible.
All the cells must be connected, since crew members should be able to walk from any cell to any other cell. They can walk from a cell A to another cell B, if, (1) A and B are touching each other or overlapping, (2) A and B are connected by a `corridor', or (3) there is a cell C such that walking from A to C, and also from B to C are both possible. Note that the condition (3) should be interpreted transitively.
You are expected to design a configuration, namely, which pairs of cells are to be connected with corridors. There is some freedom in the corridor configuration. For example, if there are three cells A, B and C, not touching nor overlapping each other, at least three plans are possible in order to connect all three cells. The first is to build corridors A-B and A-C, the second B-C and B-A, the third C-A and C-B. The cost of building a corridor is proportional to its length. Therefore, you should choose a plan with the shortest total length of the corridors.
You can ignore the width of a corridor. A corridor is built between points on two cells' surfaces. It can be made arbitrarily long, but of course the shortest one is chosen. Even if two corridors A-B and C-D intersect in space, they are not considered to form a connection path between (for example) A and C. In other words, you may consider that two corridors never intersect.
Input
The input consists of multiple data sets. Each data set is given in the following format.
n
x1 y1 z1 r1
x2 y2 z2 r2
...
xn yn zn rn
The first line of a data set contains an integer n, which is the number of cells. n is positive, and does not exceed 100.
The following n lines are descriptions of cells. Four values in a line are x-, y- and z-coordinates of the center, and radius (called r in the rest of the problem) of the sphere, in this order. Each value is given by a decimal fraction, with 3 digits after the decimal point. Values are separated by a space character.
Each of x, y, z and r is positive and is less than 100.0.
The end of the input is indicated by a line containing a zero.
Output
For each data set, the shortest total length of the corridors should be printed, each in a separate line. The printed values should have 3 digits after the decimal point. They may not have an error greater than 0.001.
Note that if no corridors are necessary, that is, if all the cells are connected without corridors, the shortest total length of the corridors is 0.000.
Sample Input
3
10.000 10.000 50.000 10.000
40.000 10.000 50.000 10.000
40.000 40.000 50.000 10.000
2
30.000 30.000 30.000 20.000
40.000 40.000 40.000 20.000
5
5.729 15.143 3.996 25.837
6.013 14.372 4.818 10.671
80.115 63.292 84.477 15.120
64.095 80.924 70.029 14.881
39.472 85.116 71.369 5.553
0
Sample Output
20.000
0.000
73.834
Source
Japan 2003 Domestic
제목: 공간에 n개의 점(x, y,z) + 반경 r(대소)가 있고 두 노드의 범위가 중첩되면 거리는 0이다. 그들의 최단 거리, 즉 최소 생성 트리를 연결한다.
소스 코드: (0MS)
#include<iostream>
#include<cmath>
using namespace std;
const int MAX_N = 105;
struct CellNode
{
double x,y,z;
double r;
};
int n;
double graph[MAX_N][MAX_N];
inline double computeDistance(CellNode a,CellNode b)
{
double dis = sqrt((a.x-b.x)*(a.x-b.x)+(a.y-b.y)*(a.y-b.y)+(a.z-b.z)*(a.z-b.z));
if(dis <= a.r + b.r)
return 0;
else
return dis - a.r - b.r;
}
double Prim()
{
double ans,closedge[MAX_N];
bool vis[MAX_N];
int i,j,k;
k = 1; //
for(i=2;i<=n;i++) //
{
vis[i] = false;
closedge[i] = graph[k][i];
}
closedge[k] = 0;
vis[k] = true; // k
ans = 0;
for(j=1;j<n;j++)
{
double min = 1000000000.0;
for(i=1;i<=n;i++) //
if(!vis[i] && closedge[i] < min)
min = closedge[k = i];
ans += min; //
vis[k] = true; //
for(i=1;i<=n;i++) // k
if(!vis[i] && graph[k][i] < closedge[i])
closedge[i] = graph[k][i];
}
return ans;
}
int main()
{
int i,j;
CellNode cell[MAX_N];
while(cin>>n)
{
if(n == 0)
break;
for(i=1;i<=n;i++)
cin >> cell[i].x >> cell[i].y >> cell[i].z >>cell[i].r;
//construct the graph
for(i=1;i<=n;i++)
{
graph[i][i] = -1;
for(j=1;j<i;j++)
graph[i][j] = graph[j][i] = computeDistance(cell[i],cell[j]);
}
printf("%.3lf
",Prim());
}
return 0;
}
이 내용에 흥미가 있습니까?
현재 기사가 여러분의 문제를 해결하지 못하는 경우 AI 엔진은 머신러닝 분석(스마트 모델이 방금 만들어져 부정확한 경우가 있을 수 있음)을 통해 가장 유사한 기사를 추천합니다:
Ruby의 구조체 클래스은 접근자 메서드가 있는 속성 모음입니다. 클래스를 명시적으로 작성할 필요 없이. Struct 클래스는 구성원 및 해당 값 집합을 포함하는 새 하위 클래스를 생성합니다. 각 멤버에 대해 #attr_accessor 와...
텍스트를 자유롭게 공유하거나 복사할 수 있습니다.하지만 이 문서의 URL은 참조 URL로 남겨 두십시오.
CC BY-SA 2.5, CC BY-SA 3.0 및 CC BY-SA 4.0에 따라 라이센스가 부여됩니다.